Crew-13
Falcon 9 Block 5. Space Launch Complex 40, Cape Canaveral SFS, FL, USA.
Launch Successful
- Recovery
- B1101: Return to Launch Site, Landing Zone 40, successful
- C213: Parachute Landing, Pacific Ocean, planned
1 Landed, 1 Awaiting a Report
- Your Time
- UTC
- At the Pad

Crew-13
SpaceX
Mission
Human Exploration, Low Earth Orbit
SpaceX Crew-13 is the thirteenth crewed operational flight of a Crew Dragon spacecraft to the International Space Station as part of NASA's Commercial Crew Program.
Countdown Sequence
Planned offsets from T-0; confirmations link to their sources
Sequence Ended · Success
- T−00:45:00
GO for Prop Load
Launch director verifies go for propellant load
Planned Time Elapsed
- T−00:42:00
Crew Access Arm Retract
Retraction of the crew access arm from the rocket
Planned Time Elapsed
- T−00:39:00
Dragon LES Arm
Dragon's launch escape system is armed
Planned Time Elapsed
- T−00:35:00
Stage 1 LOX Load
Start of liquid oxygen loading in the first stage
Planned Time Elapsed
- T−00:35:00
Prop Load
Start of propelland loading
Planned Time Elapsed
- T−00:16:00
Stage 2 LOX Load
Start of liquid oxygen loading in the second stage
Planned Time Elapsed
- T−00:07:00
Engine Chill
Start of engine chilling
Planned Time Elapsed
- T−00:05:00
Dragon Internal Power
Dragon transitions to internal power
Planned Time Elapsed
- T−00:01:00
Startup
The onboard computer takes control over the countdown and runs last checks
Planned Time Elapsed
- T−00:01:00
Tank Press
Fuel tanks are pressurized to flight levels
Planned Time Elapsed
- T−00:00:45
GO for Launch
Launch director verifies go for launch
Planned Time Elapsed
- T−00:00:03
Ignition
Start of the engine ignition sequence
Planned Time Elapsed
- T+00:00:00
- T+00:01:12
Max-Q
Maximum dynamic pressure
Planned Time Elapsed
- T+00:02:24
MECO
Cut-off of the main engine
Planned Time Elapsed
- T+00:02:27
Stage 2 Separation
Separation of the second stage from the first
Planned Time Elapsed
- T+00:02:31
Stage 1 Flip
Flip maneuver of the first stage
Planned Time Elapsed
- T+00:02:35
SES-1
First start of the second engine
Planned Time Elapsed
- T+00:02:41
Booster Boostback Burn Startup
Start of the booster boostback burn
Planned Time Elapsed
- T+00:03:27
Booster Boostback Burn Shutdown
End of the booster boostback burn
Planned Time Elapsed
- T+00:06:20
Entry Burn Startup
Start of the atmospheric entry burn
Planned Time Elapsed
- T+00:06:32
Entry Burn Shutdown
End of the atmospheric entry burn
Planned Time Elapsed
- T+00:07:24
Stage 1 Landing Burn
Start of the first stage landing burn
Planned Time Elapsed
- T+00:07:41
Stage 1 Landing
Landing of the first stage
Planned Time Elapsed
- T+00:08:47
SECO-1
First cut-off of the second engine
Planned Time Elapsed
- T+00:09:39
Dragon Separation
Dragon separates from the second stage
Planned Time Elapsed
- T+00:10:25
Dragon Nosecode Open
Start of the opening sequence of Dragon's nosecone
Planned Time Elapsed
Change Log
Detected changes and source updates
Launch success, spacecraft in operation.
Liftoff.
Updated launch weather, 60% GO.
Official Webcast by NASA has started
Updated launch weather, 40% GO.
Updated launch weather, 55% GO.
Updated launch weather, 60% GO.
GO for launch on NET October 1.
NET October 1, TBC.
NET early October.
Launch delayed due to Dragon propulsion system leak.
Updated launch time.
NET September 12.
NET mid-September.