EscaPADE
New Glenn. Launch Complex 36A, Cape Canaveral SFS, FL, USA.
Launch Successful
- Recovery
- GS1-SN002: Autonomous Spaceport Drone Ship, Jacklyn, successful
1 Landed
- Your Time
- UTC
- At the Pad

EscaPADE
Blue Origin
Mission
Planetary Science, Mars Orbit
Second flight of Blue Origin's New Glenn launch vehicle carrying the Escape and Plasma Acceleration and Dynamics Explorers (EscaPADE), a dual-spacecraft mission from University of California, Berkeley to study ion and sputtered escape from Mars. The spacecrafts' scientific goals are to understand the processes controlling the structure of Mars' hybrid magnetosphere and how it guides ion flows; understand how energy and momentum are transported from the solar wind through Mars' magnetosphere; and understand the processes controlling the flow of energy and matter into and out of the collisional atmosphere.
Payloads
2 payloads, 1,100 kg in all
Orbiter · National Aeronautics and Space Administration
550 kg
Mars
Orbiter · National Aeronautics and Space Administration
550 kg
Mars
Countdown Sequence
Planned offsets from T-0; confirmations link to their sources
Sequence Ended · Success
- T−04:30:00
Stage 2 LH2 Load
Start of liquid hydrogen loading in the second stage
Planned Time Elapsed
- T−04:00:00
Stage 2 LOX Load
Start of liquid oxygen loading in the second stage
Planned Time Elapsed
- T−04:00:00
Stage 1 LOX Load
Start of liquid oxygen loading in the first stage
Planned Time Elapsed
- T−03:30:00
Stage 1 LNG Load
Start of liquid methane loading in the first stage
Planned Time Elapsed
- T−01:00:00
Prop Load Complete
End of propellant loading
Planned Time Elapsed
- T−00:30:00
Weather Check
Check of the weather conditions for launch
Planned Time Elapsed
- T−00:17:00
Ready Poll
Polling ready ahead of terminal count
Planned Time Elapsed
- T−00:04:00
Terminal Count
Start of the terminal countdown towards launch
Planned Time Elapsed
- T−00:02:30
Tank Press
Fuel tanks are pressurized to flight levels
Planned Time Elapsed
- T−00:01:30
Internal Power
Launch vehicle switches to internal power sources
Planned Time Elapsed
- T−00:00:30
Startup
The onboard computer takes control over the countdown and runs last checks
Planned Time Elapsed
- T−00:00:30
Water Deluge
Water deluge systems turn on
Planned Time Elapsed
- T−00:00:06
Ignition
Start of the engine ignition sequence
Planned Time Elapsed
- T+00:00:00
- T+00:01:35
Max-Q
Maximum dynamic pressure
Planned Time Elapsed
- T+00:03:05
MECO
Cut-off of the main engine
Planned Time Elapsed
- T+00:03:09
Stage 2 Separation
Separation of the second stage from the first
Planned Time Elapsed
- T+00:03:17
SES-1
First start of the second engine
Planned Time Elapsed
- T+00:03:50
Fairing Separation
Separation of the payload fairing
Planned Time Elapsed
- T+00:06:48
Boosters Entry Burn Startup
Start of the boosters atmospheric entry burn
Planned Time Elapsed
- T+00:07:18
Boosters Entry Burn Shutdown
End of the boosters atmospheric entry burn
Planned Time Elapsed
- T+00:08:27
Boosters Landing Burn
Start of the boosters landing burn
Planned Time Elapsed
- T+00:09:09
Boosters Landing
Landing of the boosters
Planned Time Elapsed
- T+00:12:53
SECO-1
First cut-off of the second engine
Planned Time Elapsed
- T+00:25:00
SES-2
Second start of the second engine
Planned Time Elapsed
- T+00:26:44
SECO-2
Second cut-off of the second engine
Planned Time Elapsed
- T+00:33:18
Payload Separation
Final deployment of the payload from the rocket
Planned Time Elapsed
- T+00:33:48
Payload Separation
Final deployment of the payload from the rocket
Planned Time Elapsed
- T+01:41:54
Mission End
End of the launch vehicle's mission
Planned Time Elapsed
Change Log
Detected changes and source updates
All payloads in operation.
Spacecraft separation confirmed.
Liftoff.
New T-0.
Hold at T-17 minutes.
New T-0.
Hold at T-20s.
Unofficial Webcast by Spaceflight Now has started
Rescheduled for November 13.
Delayed due to solar storm, new launch date TBD.
Updated launch weather, >95% GO.
Rescheduled for November 12.
Scrubbed for the day due to multiple issues.
Hold at T-4:33
New T-0.
Holding for launch site weather.
New T-0.
Unofficial Webcast by Spaceflight Now has started
Updated launch window.
Updated launch weather, 65% GO at start of window (55% at end).
Weather is 65% favorable for launch.
GO for launch.
NET November 9 per marine navigation warnings.
NET November 7, to be confirmed.
NET November 9.
NET November.
NET late October.
NET Q4 2025.
NET September 29.
NET Q3 2025.
Launch delayed to Q2 2025.
NET October 13
NET September 29.
Renamed launch to reflect ESCAPADE as being on first launch of New Glenn.
NET August 2024
Added launch. NET late 2024
