Artemis II
Space Launch System Block 1. Launch Complex 39B, Kennedy Space Center, FL, USA.
Launch Successful
- Recovery
- 003: Parachute Landing, Pacific Ocean, successful
1 Landed
- Your Time
- UTC
- At the Pad

Artemis II
NASA
Mission
Human Exploration, Lunar flyby
Artemis II is the first crewed mission as part of the Artemis program. Artemis II will send a crew of 4 - 3 Americans and 1 Canadian around the moon and return them back to Earth. The mission will test the core systems of NASA's Orion spacecraft including the critical life support system, among other systems which could not be tested during Artemis I due to the lack of crew onboard.
Countdown Sequence
Planned offsets from T-0; confirmations link to their sources
Sequence Ended · Success
- T−2d 01:50:00
Launch Team On Stations
Launch team arrives to stations
Planned Time Elapsed
- T−2d 01:40:00
Countdown Start
Countdown clock begins
Planned Time Elapsed
- T−2d 01:40:00
Prop Load Preparations
Ground systems preparations for vehicle loading
Planned Time Elapsed
- T−1d 21:30:00
Orion Power On
Orion spacecraft powered up
Planned Time Elapsed
- T−1d 18:20:00
Core Stage Power On
Core stage powered up
Planned Time Elapsed
- T−1d 18:10:00
ICPS Power On
Interim cryogenic propulsion stage (ICPS) powered up
Planned Time Elapsed
- T−1d 15:45:00
RS-25 Preparations
Final preparations of the four RS-25 engines
Planned Time Elapsed
- T−1d 11:45:00
ICPS Power Off
Interim cryogenic propulsion stage (ICPS) powered down
Planned Time Elapsed
- T−1d 09:30:00
Orion Batteries Charging
Charge Orion flight batteries to 100%
Planned Time Elapsed
- T−1d 07:30:00
Core Stage Batteries Charging
Charge core stage flight batteries
Planned Time Elapsed
- T−20:15:00
ICPS Power On
Interim cryogenic propulsion stage (ICPS) powered up
Planned Time Elapsed
- T−15:00:00
Pad Closeout
All non-essential personnel leave the launch pad
Planned Time Elapsed
- T−14:15:00
Rocket Cavity Inerting
Air-to-gaseous nitrogen (GN2) changeover and rocket cavity inerting
Planned Time Elapsed
- T−13:15:00
GLS Activation
Ground launch sequencer (GLS) activation
Planned Time Elapsed
- T−12:35:00
Built-In Hold
Built in countdown hold
Planned Time Elapsed
- T−10:50:00
GO for Prop Load
Launch director verifies go for propellant load
Planned Time Elapsed
- T−10:50:00
Orion Cold Soak
Orion cold soak
Planned Time Elapsed
- T−10:40:00
Core Stage LOX Transfer Chill
Core stage LOX transfer line chilldown
Planned Time Elapsed
- T−10:40:00
Core Stage LH2 Chill
Core stage LH2 chilldown
Planned Time Elapsed
- T−10:25:00
Core Stage LOX Prop Chill
Core stage LOX main propulsion system chilldown
Planned Time Elapsed
- T−09:55:00
Core Stage LH2 Slow Fill
Core stage LH2 slow fill start
Planned Time Elapsed
- T−09:50:00
Resume T-Clock
Planned Time Elapsed
- T−09:40:00
Core Stage LOX Slow Fill
Core stage LOX slow fill
Planned Time Elapsed
- T−09:30:00
Core Stage LOX Fast Fill
Core stage LOX fast fill
Planned Time Elapsed
- T−09:25:00
Core Stage LH2 Fast Fill
Core stage LH2 fast fill
Planned Time Elapsed
- T−09:05:00
ICPS LH2 Chill
ICPS LH2 chilldown
Planned Time Elapsed
- T−08:30:00
ICPS LH2 Fast Fill
ICPS LH2 fast fill start
Planned Time Elapsed
- T−08:00:00
Core Stage LH2 Topping
Core stage LH2 topping
Planned Time Elapsed
- T−07:55:00
Core Stage LH2 Replenish
Core stage LH2 replenish
Planned Time Elapsed
- T−07:45:00
ICPS LH2 Vent & Relief Test
ICPS LH2 vent and relief test
Planned Time Elapsed
- T−07:20:00
ICPS LH2 Topping
ICPS LH2 tank topping start
Planned Time Elapsed
- T−07:05:00
ICPS LH2 Replenish
ICPS LH2 replenish
Planned Time Elapsed
- T−06:40:00
ICPS LOX Prop Chill
ICPS LOX main propulsion system chilldown
Planned Time Elapsed
- T−06:40:00
Core Stage LOX Topping
Core stage LOX topping
Planned Time Elapsed
- T−06:40:00
Orion Comms On
Orion communications system activated (radio frequency to mission control)
Planned Time Elapsed
- T−06:30:00
ICPS LOX Fast Fill
ICPS LOX fast fill
Planned Time Elapsed
- T−06:10:00
Closeout Crew Assemble
Closeout crew assemble
Planned Time Elapsed
- T−06:10:00
Stage Pad Rescue
Stage pad rescue
Planned Time Elapsed
- T−06:05:00
Core Stage LOX Replenish
Core stage LOX replenish
Planned Time Elapsed
- T−06:00:00
Weather Check
Check of the weather conditions for launch
Planned Time Elapsed
- T−05:45:00
ICPS LOX Vent & Relief Test
ICPS LOX vent and relief test
Planned Time Elapsed
- T−05:30:00
ICPS LOX Topping
ICPS LOX topping
Planned Time Elapsed
- T−05:10:00
ICPS LOX Replenish
ICPS LOX replenish
Planned Time Elapsed
- T−05:10:00
All Stages Replenish
All stages replenish
Planned Time Elapsed
- T−05:10:00
Built-In Hold
Built in countdown hold
Planned Time Elapsed
- T−05:10:00
Closeout Crew To White Room
Closeout crew to white room
Planned Time Elapsed
- T−04:40:00
Flight Crew To Pad
Flight crew deployment to pad
Planned Time Elapsed
- T−04:00:00
Orion Boarding
Flight crew board Orion
Planned Time Elapsed
- T−03:40:00
Hatch Closure
Crew module hatch preps and closure
Planned Time Elapsed
- T−03:10:00
Hatch Seal Checks
Counterbalance mechanism hatch sealpress decay checks
Planned Time Elapsed
- T−02:20:00
Hatch Closeouts
Crew module hatch service panel install/closeouts
Planned Time Elapsed
- T−01:40:00
LAS Hatch Closure
Launch abort system (LAS) hatch closure for flight
Planned Time Elapsed
- T−01:10:00
TPS Scan
Launch director brief – rocket & thermal protection system scan results with the imagery console
Planned Time Elapsed
- T−00:50:00
Test Director Briefing
Final test director briefing is held
Planned Time Elapsed
- T−00:50:00
Pad Clear
Closeout crew departs the pad
Planned Time Elapsed
- T−00:40:00
Built-In Hold
Built in countdown hold
Planned Time Elapsed
- T−00:25:00
Orion Comms Transition
Transition team to Orion to Earth communication loop following final NTD briefing
Planned Time Elapsed
- T−00:17:00
Ready Poll
Polling ready ahead of terminal count
Planned Time Elapsed
- T−00:15:00
Visors Down
Flight crew visors down
Planned Time Elapsed
- T−00:14:00
Short Purge
Flight crew short purge verification
Planned Time Elapsed
- T−00:10:00
Terminal Count
Start of the terminal countdown towards launch
Planned Time Elapsed
- T−00:08:00
Crew Access Arm Retract
Retraction of the crew access arm from the rocket
Planned Time Elapsed
- T−00:06:00
Tank Press
Fuel tanks are pressurized to flight levels
Planned Time Elapsed
- T−00:06:00
Orion Pyros Arm
Orion ascent pyros are armed
Planned Time Elapsed
- T−00:06:00
Orion Internal Power
Orion set to internal power
Planned Time Elapsed
- T−00:05:57
Core Stage LH2 Replenish End
Core stage LH2 terminate replenish
Planned Time Elapsed
- T−00:05:20
LAS Available
LAS capability is available
Planned Time Elapsed
- T−00:04:40
LH2 High Flow Bleed Check
GLS go for LH2 high flow bleed check
Planned Time Elapsed
- T−00:04:30
FTS Arm
Flight termination system armed
Planned Time Elapsed
- T−00:04:00
Core Stage APU Start
Core stage auxiliary power unit (APU) start
Planned Time Elapsed
- T−00:04:00
Core Stage LOX Replenish End
Core stage LOX terminate replenish
Planned Time Elapsed
- T−00:03:30
ICPS LOX Replenish End
ICPS LOX terminate replenish
Planned Time Elapsed
- T−00:03:10
Purge Sequence 4
GLS go for purge sequence 4
Planned Time Elapsed
- T−00:02:02
ICPS Internal Power
ICPS switches to internal battery power
Planned Time Elapsed
- T−00:02:00
Booster Internal Power
Booster switches to internal batter power
Planned Time Elapsed
- T−00:01:30
Core Stage Internal Power
Core stage switches to internal power
Planned Time Elapsed
- T−00:01:20
ICPS Terminal Count
ICPS enters terminal countdown mode
Planned Time Elapsed
- T−00:00:50
ICPS LH2 Replenish End
ICPS LH2 terminate replenish
Planned Time Elapsed
- T−00:00:33
GO for Launch
Launch director verifies go for launch
Planned Time Elapsed
- T−00:00:30
Core Stage Terminal Count
Core stage flight computer to automated launching sequencer
Planned Time Elapsed
- T−00:00:12
Hydrogen Burnoff Igniters
Hydrogen burn off igniters initiated
Planned Time Elapsed
- T−00:00:10
Core Stage Engine Start
Core stage engine start
Planned Time Elapsed
- T−00:00:06
Ignition
Start of the engine ignition sequence
Planned Time Elapsed
- T+00:00:00
Booster Ignition
Ignition of the solid rocket boosters.
Planned Time Elapsed
- T+00:00:00
- T+00:00:09
Tower Clear
The launch vehicle clears the launch tower and initiates a roll/pitch maneuver
Planned Time Elapsed
- T+00:00:56
Supersonic
Vehicle is supersonic
Planned Time Elapsed
- T+00:01:10
Max-Q
Maximum dynamic pressure
Planned Time Elapsed
- T+00:02:08
SRB Separation
The solid rocket boosters are separated from the launcher.
Planned Time Elapsed
- T+00:03:18
Launch Escape Jettison
The launch escape system is no longer needed and is jettisoned.
Planned Time Elapsed
- T+00:08:06
MECO
Cut-off of the main engine
Planned Time Elapsed
- T+00:08:18
Stage 2 Separation
Separation of the second stage from the first
Planned Time Elapsed
- T+00:08:28
ICPS RL10 Nozzle Extension
ICPS RL10 nozzle extension
Planned Time Elapsed
- T+00:20:00
Orion Solar Arrays Deployment
Orion solar arrays deploy
Planned Time Elapsed
- T+00:49:00
Perigee Raise Burn
Perigee raise burn
Planned Time Elapsed
- T+01:47:57
Apogee Raise Burn
Apogee raise burn
Planned Time Elapsed
- T+03:24:15
Orion Separation
Orion separates from ICPS
Planned Time Elapsed
- T+04:35:00
Proximity Operations End
Proximity operations conclude
Planned Time Elapsed
- T+04:52:00
Orion Separation Burn
Orion upper stage separation burn
Planned Time Elapsed
- T+05:00:00
ICPS Disposal Burn
Disposal burn of ICPS into the Pacific Ocean
Planned Time Elapsed
- T+05:04:00
CubeSats Deployment
CubeSats deploy
Planned Time Elapsed
- T+13:44:00
Perigee Raise Burn
Perigee raise burn
Not Confirmed
- T+1d 01:37:00
Translunar Injection Burn
Translunar injection burn
Not Confirmed
- T+1d 23:25:00
Orbital Trajectory Correction Burn
Orbital trajectory correction burn
Not Confirmed
- T+2d 00:07:00
Orbital Trajectory Correction Burn
Orbital trajectory correction burn
Not Confirmed
- T+2d 02:05:00
Crew CPR Demo
Crew CPR demonstration
Not Confirmed
- T+2d 05:25:00
DSN Comms Test
Communications test through Deep Space Network
Not Confirmed
- T+3d 00:12:00
Orbital Trajectory Correction Burn
Orbital trajectory correction burn
Not Confirmed
- T+3d 03:40:00
Lunar Flyby Imaging Plan Review
Review lunar flyby imaging plan
Not Confirmed
- T+3d 05:45:00
Lunar Flyby Imaging Plan Review
Review lunar flyby imaging plan
Not Confirmed
- T+3d 20:30:00
Spacesuits Demo
Rapid spacesuits donning and pressurization demonstration
Not Confirmed
- T+4d 05:23:00
Orbital Trajectory Correction Burn
Orbital trajectory correction burn
Not Confirmed
- T+4d 06:59:00
Orion Enters Lunar SOI
Orion enters lunar sphere of influence
Not Confirmed
- T+4d 22:00:00
Lunar Flyby
Lunar flyby and observation begins
Not Confirmed
- T+5d 01:23:00
Lunar Closest Approach
Closest approach to the Moon
Not Confirmed
- T+5d 01:26:00
Max Distance To Earth
Crew reaches maximum distance from Earth for this mission
Not Confirmed
- T+5d 19:47:00
Orion Exits Lunar SOI
Orion exits lunar sphere of influence
Not Confirmed
- T+5d 21:10:00
Lunar Flyby Debrief
Lunar flyby science debrief
Not Confirmed
- T+6d 04:23:00
Orbital Trajectory Correction Burn
Orbital trajectory correction burn
Not Confirmed
- T+7d 01:50:00
Radiation Shielding Demo
Radiation shielding demonstration
Not Confirmed
- T+7d 04:20:00
Manual Piloting Demo
Manual piloting demonstration
Not Confirmed
- T+7d 23:15:00
Orthostatic Intolerance Garment Test
Orthostatic intolerance garment assessment
Not Confirmed
- T+8d 02:10:00
Orthostatic Intolerance Garment Test
Orthostatic intolerance garment assessment
Not Confirmed
- T+8d 04:33:00
Orbital Trajectory Correction Burn
Orbital trajectory correction burn
Not Confirmed
- T+8d 20:33:00
Orbital Trajectory Correction Burn
Orbital trajectory correction burn
Not Confirmed
- T+8d 22:30:00
Crew Entry Preparations
Crew begins working through entry checklist, including donning entry suits
Not Confirmed
- T+9d 01:13:00
Orion Service Module Jettison
Orion crew and service module separation
Not Confirmed
- T+9d 01:16:00
Orion Raise Burn
Orion raise burn
Not Confirmed
- T+9d 01:33:00
Atmospheric Entry
Start of the atmospheric re-entry
Not Confirmed
- T+9d 01:46:00
Orion Splashdown
Orion splashdown
Not Confirmed
- T+9d 01:53:00
Orion RCS Safing
Orion crew module reaction control system safing
Not Confirmed
- T+9d 02:01:00
Orion Power Off
Orion Final power down
Not Confirmed
Change Log
Detected changes and source updates
Launch success with Orion separation.
Liftoff.
New T-0.
Extending hold at T-10 minutes.
Updated launch weather.
Official Webcast by NASA has started
Updated launch weather.
T-0 is accurate to the second.
Updated launch weather, 80% GO.
Targeting April 1st.
Delayed to NET April due to upper stage helium leak issue.
Reverted back to NET March 6 EST, to be confirmed.
Moved back up to NET March 3, to be confirmed (see also https://x.com/nasaspaceflight/status/2019805496836767830.)
Delayed to NET March, to be confirmed pending additional tests.
Delayed to NET February 8 EST, to be confirmed.
Refined launch window.
Updated approximate launch time.
Added launch window.
NET February 5.
Moved up to NET February.
NET April 2026.
NET September 2025.
NET November 2024